Job #5908
brand spanking new Tabou with shipping damage on the bottom
pry up the depressed sandwich to make things as continuous on the outer surface as possible
inject 2-part Urethane to glue the innards back together and fill any voids (note thorough covering, in case of a blow-out)
tidy away all overage, and bevel grind the original laminations, to make room for the new ones
Return to assorted repairs